Green Cast LLC. Private Draft Site

Compare Cost and Advantages
Affordable Luxury 5 star Tower Living
TrussCast Coastal modular Plant using new LavaUltraCrete technology.
Museum Construction Co featuring lavapoxy foam core displays
Lake Mansion Models in Kingwood Shores
Lake Trend Homes and Condos
Cost and Time Advantages
Structural Insulated Panels
Designer Cores
Contact Us
Licensees of Ultra Crete
Lake Trends Homes
Coastal Mansions Affordable Luxury Towers
Lake Conroe - Houston Demographics

Scroll down
 to bottom of page
and return to side menu

Optional site casting using affilitate Molds from Lava
Ultra Crete for remote located projects  for one to ten story construction

medstpetersbayaerial.jpg

8unitspacoastalmansion.jpg

The 1200 sq. ft one bedroom plus office/guest remote entry.
the samd floor plan can share two more adjoing bedrooms with baths for 4 bed room 4 bath 1800 to 2000 sq. ft condos
with one module sharing between left and righ adjoining 1200 sq. central module.

One side of Twin Towers for 8 units per floor
per tower
Floor plan for 1500 to 2300 sg ft condos
 

xkitchenbwmodel.jpg

Our total designing and building system is unique to our company. Many companies offer some pre-cast or tilt up systems but most still have to be finished by hand in the old traditional time consuming ways.  All the real time consuming operations such as insulating, electrical, plumbing, and air conditioning, installing brick, tile, stone,  dry wall, cabinets, counter top, electrical  and plumbing and air conditioning, duct sytems, base and  trim out, molding trim, doors, windows etc are all very time consuming especially in a multi level building.  In the traditional building systems none of these operations can be done until the structure is built.  In our system they can be built 24 hours a day 7 days a week on the ground in precise factory controlled conditions and erected in just days instead of months, and at the same time the preliminary site preparation and foundation is going in (saving many months).  In traditional projects,  cost and construction time is still in the 10 to 24 month project scheduling, due much to weather delays and the fact that most operations have to be completed before the rest can be done. Also the loss from stolen and material damage from trying to site warehouse  and move all the materials up stair ways or costly crane time during the construction process adds greatly to the cost.  The out of date old methods of on site  construction scheduling is no longer affordable and the resulting buildings are very inferior to ours. Due to the fact that  doing things up in the air on site is much more complicated and much more expensive and not nearly as fast as factory conditions.  The price of factory wages  in many cases are assisted by the government training programs, makes total cost much less that traditional high priced sub contractors wages, hugh bonding costs, sub contractors builders risk insurance, exsorbant high rise workman comp insurance and extra sales taxes and middlemen multi location warehouse  deliver  and marketing fees.  In normal construction the shell erection and finishing can not happen until many other events happen.  We are able to shave months off of the construction schedule (6 to 12 months quicker occupancy can mean million of dollars in savings and huge revenue cash flow advantages ) by pre-building in the factory 24-7  all the real time consuming operations happen at the same time as  the off site preparations are being done.  Many times the pre-built pre- finished kitchen and bath modules with all the airconditioning, wiring, switches, and the exotic designer finished concrete panels can be built before a normal project could even schedule the first stage of construction. With our system the building can be ready to set by a crane in just weeks, with 95% of the building already built, All this can be completed while the clearing and  land preparations, soil compaction permitting, under building utlilities, parking  foundations and utilities are going in a normal project.  We also save by buying bulk price materials as an Original Equipment Manufacturer (OEM pricing) saving many stages of manufacture to distributor to dealer to builder to owner distribution cost and delivery expense.  In our system we are manufacturing much of the products that would would normally have 2 or 3 stages of distributor, dealer and sales commissions figure into the cost.

We can build much better quality luxury granite kitchens and baths that,  would cost $10,000's more if built on site, in our sytem we   also have 95 % of the wiring and electrical,  breakers, plumbing, venting, hotwater heating, all appliances and air conditioning installed and ready to set by crane in just one lift and in just a few weeks erection schedule.  Building  in factory controlled conditions gives a much better fit and finishes, dramatic architecture with high ceilings Dramatic windows and sky lights with life time exotic stone like finishes  that would be many times  higher cost in normal costruction. There are very few companies that even offer prefinished panels,  none I know of that do our total designed , pre-wired,  pre-engineered and factory pre-built modular concrete core kitchens baths and closets.

 Modular pre-finished , kitchen and bath-closet cores and foam core concrete sip panels can save millions of dollars in material and time saved while  building  the best class of  all reinforced concrete towers, commercial buildings and better  home construction.  We also can build parking garages and commercial projects with regular unfinished hollow core panels for spans up to 60 feet between spans.

kitmod.jpg

woodlandtowersfloorplan619.jpg

Luxury affordable tower Living for the empty nester

Call

office for LavaDesign Co. and TrussCast Co 8300 Bissonet, Houston Tx.77074 is the marking office for the Licensed factory affilliates of TrussCast-Lavafiber-UltraCrete Co. for Port Author Texas plant comming in 2011.